Please wait while we load your requested schematics and specifications.
Design, technical office and as-built work by the CIES and Contek-EG engineering team in France, Greece and Saudi Arabia.
Full as-built documentation of the electrical, HVAC and fire-fighting systems across the main church and two four-storey administration buildings. Alongside the survey, we redesigned parts of the heating system to cut energy use.
HVAC and its electrical works from start to finish: full design, selection of a VRV system, support through installation, and the final as-built drawings.
Total MEP technical office for two six-storey malls of about 800 m² per floor, from design through shop drawings to as-built drawings.
Through Contek-EG, our team has delivered MEP contracting and engineering on major projects.
Total MEP including operating rooms and hygienic air; cooling tower renovations at two private hospitals.
Chilled-water network for a 1,800 TR plant at a Red Sea resort; full renovation of 3 cooling towers at an airport hotel.
Total MEP for a chocolate factory including chilled water, compressed air and steam; HVAC and cold rooms for a 10,000 m² confectionery factory.
Total MEP, mainly HVAC and fire-fighting, for a machine-tool plant; HVAC, fire-fighting, electrical and controls for a wind farm.